ML4WX

Post-processing & calibration

Improved rainfall forecasts in daily use over East Africa

Fenwick C. Cooper, Shruti Nath, Andrew T. T. McRae, Bobby Antonio, Matthew Wright, Antje Weisheimer, Tim Palmer, Masilin Gudoshava, Nishadh Kalladath, Ahmed Amidhun, Jason Kinyua, Hannah Kimani et al.

arXiv preprint · · ECMWF, University of Oxford

PaperPDF

In one sentence. A cGAN post-processing of the ECMWF ensemble gives East African rainfall skill comparable to IDR-calibrated FuXi and GraphCast, and was assessed operationally in Kenya and Ethiopia.

Abstract

Ensemble forecasting has proven to be a vital tool for predicting extreme, life-threatening or only partially predictable weather events. As well as providing probabilistic products, individual ensemble members provide context and realisations of possible extreme weather. However, many National Meteorological Services in East Africa do not have the computing resources to enable them to run their local area models in ensemble mode over the full period of the two-week medium range. In this paper we test the performance of a forecast system, comprising the global ECMWF ensemble forecast, post-processed using cGAN, a neural network model, and forecasts calibrated using IDR, a recent statistical method, against the probabilistic climatology. cGAN provides comparable levels of probabilistic skill as IDR applied to the ECMWF ensemble or IDR applied to the machine-learning models FuXi and GraphCast. These methods improve the raw ECMWF ensemble forecast substantially, which is itself an improvement on deterministic forecasts. The ability of cGAN to produce individual realisations of future rainfall was important when assessed in an operational context by the National Meteorological and Hydrological Services of Kenya and Ethiopia. Moreover, in common with IDR, cGAN is cheap to train/run and requires no additional post-processing. It is run on laptops to generate many thousands of ensemble members, making it suitable for Meteorological Services with limited computational facilities.

Labels

Topic
Post-processing & calibration, Probabilistic & ensemble forecasting, Applications & impacts
Type
Application study
Method
GAN or VAE, Classical ML (trees, GP, linear, kernels)
Time scale
3–15 days
Domain
Regional
Data
NWP analysis or forecasts (IFS, GFS, ...), Station / in-situ
Status
Pre-operational / experimental
Identifiers
arXiv:2512.24525 OpenAlex:W7118007372
Added
2026-10-22

Labels and summary are generated by Claude and reviewed weekly. Wrong? Edit this entry.